BRIEF DESCRIPTION

The project was to perform complete replacement of all exising windows and inside moldings with Anderson 400-series. Measurments has been taken and confirmed with the supplier and manufacturer, it took about 1 month for the delivery and then another month to repalace all 40 units. During replacement we had to repair water damaged wall caused by improperly installed previous windows. All work was done in full according to the contract and in time. Additional charges were applied to cover rotten wood replacement found during installation.

AT A GLANCE
Project Type Windows replacement
Location Dover MA
Completion Date February 2016
Project Size 42 units
Project cost $65,000
SCOPE OF WORK
  • Prepaire the job site
  • Move all the furniture away
  • Protect work sites
  • Dumpster on job site
  • Remove old windows
  • Install new Anderson windows
  • Finish outside with PVC trim board
  • Finish inside with primed pine molding
  • Dispose old windows
  • Clean up job site daily