- 22.05.2018
Contract has been signed to replace existing roof with new arhitectural liftime shingles and 4 – star extended warranty. We hang the turps of the bottom of the roof and protect the surroundings. Once strip was finnished we inspect the deck for any water damaged wood. Right after that we put 6f of Ice&water shield and cover the remaining of the roof with syntetic shingle underlayement. Shingles begin to be installed using 6 nail per shingle (Storm nails). After that we install ridge vent ant the peaks and clean up all debries.